Facade Maintenance Design, PCLocal Law 11 :: The filing deadline for cycle 6 of local law 11 is February 21, 2007. Facade Maintenance Design (FMD) has specialized in the investigation, repair and rehabilitation of building exteriors and facades, restoring architectural beauty, preserving and protecting historical character, extending property life, enhancing property value, and satisfying owner/manager safety concerns. FMD Facade Maintenance Design Exterior Rehabilitation & Exterior Landmark Restoration Design Experts
FMD
NYC Local Law 11 of 1998
The filing deadline for cycle 6
of local law 11 is February 21, 2007.


SIGNIFICANT REQUIREMENTS

  • Your Professional is required to inspect a representative sample of the façade close-up from scaffolding.
  • If your previous Cycle 5 report was filed with any SWARMP conditions, they need to be repaired before the Cycle 6 report is filed.

  • There are two repair seasons left before any unrepaired conditions automatically obtain "default unsafe" status on the Cycle 6 filing.

  • If new unsafe conditions are noted during the Cycle 6 inspection, your professionals are required to inform the Building Department immediately.
RECOMMENDATIONS
  • We recommend beginning to plan for façade repairs early, as the new requirements will likely increase demand for contractors, scaffolding and sidewalk bridging.
Façade Maintenance Design Architecture and Engineering PC can assist you to
  • Identify the status of your façade

  • Assist you to formulate a repair strategy

  • Prepare Construction Documents

  • Filing compliance requirements